Construction of Pit (Elvoron LU/LA and Stella)

From Garaventapedia

Jump to: navigation, search

The pit must be the same width and length as the hoistway. The majority of the weight of the lift is borne by the plunger (ram). Reactions are indicated on each project’s shop drawings. A 14” (355 mm) pit is recommended.

Personal tools
Inclined Platform Lifts
LU/LA Elevators
Portable Wheelchair Lifts